Layer 4 — Pilot Authority

Can this policy be tested safely with clear stop/scale criteria?

Gate Profile

Institution: Trial Commission + Sunset Controller

Mandate: Approves bounded pilots, defines test metrics, and enforces sunset clauses before scale-up.

In plain terms: Policies are tested in contained environments before national rollout.

Why this gate exists: It applies institutional humility and reduces catastrophic policy lock-in.

Entry Criteria

  • Constitutional and finance clearance from Layers 0 and 3
  • Defined pilot population and timeline
  • Pre-registered metrics and evaluation protocol

Exit Criteria

  • Pilot authorization and operating guardrails
  • Sunset, renewal, and rollback triggers locked
  • Independent evaluation plan published

Primary Outputs

  • Pilot charter
  • Sunset and renewal schedule
  • Risk controls for bounded execution

Failure Triggers and Escalation

  • Pilot scope creep beyond approved boundary
  • Outcome metrics not published on schedule
  • Safety or rights incidents above threshold

Escalation rule: If pilot fails safety or efficacy thresholds, rollout halts and redesign or sunset triggers automatically.

Bodies Operating in This Gate

Trial Commission

Members: Pilot Commissioners

Lead title: Trial Marshal

Purpose: Approves bounded pilots with predefined success and failure thresholds.

Sunset Controller

Members: Sunset Arbiters

Lead title: Renewal Arbiter

Purpose: Enforces automatic expiry or renewal reviews based on published outcomes.

For full selection mechanics, see Bodies and Titles.

Constitutional Rationale

Embeds institutional humility by making reversibility and evidence prerequisites for scale.

Gate Navigation

Back to Deployment Gates overview

Previous gate: Layer 3 — Finance and Incentive Engine

Next gate: Layer 5 — Delivery Network